Aller au menu principal Aller au contenu
Published on

Parking Ste Aurélie – Platform 1 and track 25 of the Sncf station are inaccessible at night.

Work on platform 1 of the Sncf railway station is scheduled to start on :

1 September to 30 November 2020,

from Monday to Saturday

from 9 pm to 4.30 am.

A direct connection between the car park and platform 1 is therefore impossible at night.

To reach platform 1 or lane 25 from the Ste Aurélie car park or to pick up your vehicle in the park from the SNCF station, take Boulevard de Metz.

Thank you for your understanding.