Published on
Parking Ste Aurélie – Platform 1 and track 25 of the Sncf station are inaccessible at night.
Work on platform 1 of the Sncf railway station is scheduled to start on :
1 September to 30 November 2020,
from Monday to Saturday
from 9 pm to 4.30 am.
A direct connection between the car park and platform 1 is therefore impossible at night.
To reach platform 1 or lane 25 from the Ste Aurélie car park or to pick up your vehicle in the park from the SNCF station, take Boulevard de Metz.
Thank you for your understanding.